TOP NEWS
INCATEMA is awarded the preparation of the water supply master plan of a new refugee camp in Ethiopia
INCATEMA is awarded the preparation of the water supply master plan of a new refugee camp in Ethiopia

INCATEMA Consulting & Engineering has been engaged by UNICEF, with an urgency request, to carry out in Ethiopia the “Construction supervision and contract administration for a new water supply system for Gure and Shembolla host communities ...

Impact assessment for common agricultural policy measures on viable food production has started
Impact assessment for common agricultural policy measures on viable food production has started

The new Common Agricultural Policy (CAP) reformulated in 2015, features new instruments that seek enhancing viable food production with a regional focus and environment protection measures.
The aim of this study is to assess CAP impact on viab ...

The main pumping station plot enclosure within water supply works in Port-au-Prince (Haiti) comes to an end.
The main pumping station plot enclosure within water supply works in Port-au-Prince (Haiti) comes to an end.

The enclosure for the plot containing the main pumping station is completed, and the building to host the pumps is being built. Pipes have already been sent and electromechanical elements are being manufactured. Works are divided in two lots, one of ...

Incatema © 2013 | ALL RIGHTS RESERVED
Incatema consulting