Public water supply network construction works start in PORT AU PRINCE (HAITI)

Public water  supply network construction works start in  PORT AU PRINCE (HAITI)

After concluding engineering designs at INCATEMA headquarters, in Madrid, works have been launched. The team is finishing the main pumping station siding and prior studies for electromechanical equipment in Mariani pumping station have been completed. This zone will be renewed without interrupting water supply installing a diverting pipe to an existing reservoir. Water is pumped from eight existing wells our team is studying with pumping tests to determine the aquifer response and validate the proposed pumping scheme.

Incatema © 2013 | ALL RIGHTS RESERVED
Incatema consulting